" See that the boiler is thoroughly heated before the trial to its usual working temperature. If the boiler is new and of a form provided with a brick setting, it should be in regular use at least a week before the trial, so as to dry and heat the walls.... "
Stationary Engineering ... - Page 435
by Joseph Gerald Branch - 1906 - 991 pages
Full view - About this book

Transactions, Volume 6

American Society of Mechanical Engineers - 1885 - 984 pages
...heat the walls. VIII. Before beginning a test, the boiler and connections should be free from leaks, and all water connections, including blow and extra feed pipes, should be disconnected or stopped with blank flanges, except the particular pipe through which water is to be fed 7: iiif...
Full view - About this book

A Treatise on Steam-boilers: Their Strength, Construction, and Economical ...

Robert Wilson - 1892 - 530 pages
...heat the walls. VIII. Before beginning a test, the boiler and connections should be free from leaks, and all water connections, including blow and extra feed pipes, should be disconnected or stopped with blank flanges, except the particular pipe through which water is to be fed to the boiler...
Full view - About this book

A Treatise on Steam-boiler: Their Strength, Construction, and Economical Working

Robert Wilson - 1889 - 492 pages
...heat the walls. VIlI. Before beginning a test, the boiler and connections should be free from leaks, and all water connections, including blow and extra feed pipes, should be disconnected or stopped with blank flanges, except the particular pipe through which water is to be fed to the boiler...
Full view - About this book

Experimental Engineering and Manual for Testing: For Engineers and for ...

Rolla Clinton Carpenter - 1892 - 830 pages
...least a week before the trial, so as to dry and heat the walls. If it has been laid off and become cold, it should be worked before the trial until the walls are well heated. VII. Th'! bailor and fonnidions should be proved to be free from leaks before beginning a test, and all...
Full view - About this book

The Mechanical Engineer's Pocket-book: A Reference Book of Rules, Tables ...

William Kent - 1895 - 1234 pages
...before the trial, so as to dry and heat the walls. If it hns been laid off and become culd, it should he worked before the trial until the walls are well heated. VII. The botler and connections should be proved to be free from leaks before beginning n test, and all water...
Full view - About this book

The Pioneer Vertical Water-tube Boiler of the World

Hazelton boiler company, New York - 1897 - 162 pages
...heat the walls. EKJHTH. Before beginning a test, the boiler and connections should be free from leaks, and all water connections, including blow and extra feed pipes, should be disconnected or stopped with blank flanges, except the particular pipe through which water is to be fed to the boiler...
Full view - About this book

The Heat Efficiency of Steam Boilers: Land Marine and Locomotive: With Tests ...

Bryan Donkin - 1898 - 340 pages
...least a week before the trial, so as to dry and heat the walls. If it has been laid off and become cold, it should be worked before the trial until the...should be disconnected, stopped with blank flanges, or led through special openings beyond the valves, except the particular pipe through which water is to...
Full view - About this book

The Heat Efficiency of Steam Boilers: Land Marine and Locomotive: With Tests ...

Bryan Donkin - 1898 - 344 pages
...least a week before the trial, so as to dry and heat the walls. If it has been laid off and become cold, it should be worked before the trial until the walls are well heated. VII. The hotter and connections should be proved to be free from leaks before beginning a test, and all water...
Full view - About this book

Steam-boiler Practice: In Its Relation to Fuels and Their Combustion and the ...

Walter Bradlee Snow - 1899 - 340 pages
...least a week before the trial, so as to dry and heat the walls. If it has been laid off and become cold, it should be worked before the trial until the...and all water connections, including blow and extra feed-pipes, should be disconnected, stopped with blank flanges, or bled through special openings beyond...
Full view - About this book

The Heine Safety Boiler Co: Manufacturers of Water Tube Steam Boilers for ...

Heine Safety Boiler Company - 1900 - 220 pages
...least a week before the trial, so as to dry and heat the walls. lf it has been laid off and become cold, it should be worked before the trial until the walls are well heated. Vll. The boiler and connections should be proved to be free from leaks before beginning a test, and...
Full view - About this book