Specifications for Construction of Roads and Bridges in National Forests and National Parks, 1941

Front Cover
 

Contents

Roadside Cleanup Wooded areas
96
Spot Subgrade Reinforcement__
99
Subgrade Preparation of new subgrade
101
Finishing Earth Graded Roads Special finishing of new subgrade
103
Fine Grading Subgrade and Shoulders Reprepa ration of previously constructed subgrades
105
Shoulders__
107
Watering
109
Selected Borrow Base Course
110
Stabilized Soil Base Course
113
Gravel Base Course__
117
52A Crushed Gravel or Crushed Stone Base Course
122
Telford Base Course__
127
Sledged Stone Base Course___
129
Dry Choked Stone or Slag Base Course_
131
Waterbound Macadam Base Course
134
Reconstructed Stone or Gravel Base Course_
140
Reconditioning of Used Roadbed Preparatory to bituminizing
143
Bituminous Macadam Base Course Asphalt or tar
145
Hot Bituminous Concrete Base Course
151
SURFACE COURSES AND PAVEMENTS 100 Selected Borrow Surface Course_
163
Gravel Surface Course _ _ _
166
Crushed Gravel or Crushed Stone Surface Course
171
Bituminous Prime Coat__
176
Bituminous Tack Coat_
179
Bituminous Preservative Treatment
181
Class A Seal Coats _ _ _
189
Class A Surface Treatments
196
Class B1 Dense Graded RoadMix Surface 1
203
Class B2 Dense Graded PlantMix Surface Course
211
Class C1 Dense Graded RoadMix Surface Course
218
Item Page 123 Class C2 Open Graded RoadMix Surface Course_
226
Class D Type D1 Mosaic Macadam Pavement Asphalt or tar
234
Class D Type D2 Three Application Macadam Pavement Asphalt or tar
240
Class E1 Macadam Pavement PlantMix Seal Coat Asphalt or tar
247
Class E2 Type EM Four Application Macadam Pavement Emulsified asphalt
261
Class F Type F1 Dense Graded PlantMix
267
Class F Type F2 Open Graded PlantMix
276
STRUCTURES
281
Concrete and Stone Masonry Bridges
283
Steel Bridges
288
Timber Bridges
291
Log Bridges
296
Log Culverts
298
Culverts and Retaining Walls
299
Concrete Classes A B D and S
300
A Concrete Classes XA XB XC XX XY and XS
324
Reinforcing Steel
330
Structural Steel
332

Other editions - View all

Common terms and phrases

Popular passages

Page 134 - The gallonage or tonnage determined as provided above, shall be paid for at the respective contract unit price per gallon or ton in the bid schedule for bituminous prime coat which price and payment shall be full compensation for furnishing, delivering and applying the material, for...

Bibliographic information