Documents of the City of Boston, Volume 1, Issues 1-23City Council, Printing Section, 1904 |
From inside the book
Results 1-5 of 17
Page 16
... artificial stone. It is in a good condition. Charlestown Bridge (from Boston to Charlestown). This bridge was opened to public travel November 27, 1899, and superseded the old Charles River bridge, which was built in 1785–86. • The ...
... artificial stone. It is in a good condition. Charlestown Bridge (from Boston to Charlestown). This bridge was opened to public travel November 27, 1899, and superseded the old Charles River bridge, which was built in 1785–86. • The ...
Page 33
... artificial stone sidewalks were received and reported upon to the Paving Division. In eighty-three cases the Paving Division was notified that the existing edgestone should be reset, preparatory to the laying of artificial stone. to ...
... artificial stone sidewalks were received and reported upon to the Paving Division. In eighty-three cases the Paving Division was notified that the existing edgestone should be reset, preparatory to the laying of artificial stone. to ...
Page 47
... artificial stone sidewalk, inside grade of artificial stone sidewalk tested and measurement of edgestone and artificial stone sidewalk paving. - JMelcher street, between Summer street and A street. Line and grade for edgestone and ...
... artificial stone sidewalk, inside grade of artificial stone sidewalk tested and measurement of edgestone and artificial stone sidewalk paving. - JMelcher street, between Summer street and A street. Line and grade for edgestone and ...
Page 48
... artificial stone sidewalk, inside grade of artificial stone sidewalk tested and measurement of artificial stone sidewalk. - West First street, between A street and New England Railroad. Line and grade for edgestone. West Broadway ...
... artificial stone sidewalk, inside grade of artificial stone sidewalk tested and measurement of artificial stone sidewalk. - West First street, between A street and New England Railroad. Line and grade for edgestone. West Broadway ...
Page 49
... artificial stone sidewalk. Saratoga Street, at Chemical Engine-house No. 7. Line and grade for resetting edgestone and paving driveway. Saratoga street, between Wordsworth street and Trumbull street. Line and grade for resetting ...
... artificial stone sidewalk. Saratoga Street, at Chemical Engine-house No. 7. Line and grade for resetting edgestone and paving driveway. Saratoga street, between Wordsworth street and Trumbull street. Line and grade for resetting ...
Other editions - View all
Common terms and phrases
April and Oct artificial stone sidewalk Assistant Assessor bridge Brighton Brought forward building Carried forward Chap Charlestown Charlestown Bridge City of Boston Debt District Division e e º e º e e º º e s tº East Boston edgestone tested estates for assessment expenses Fort Point channel grade for edgestone grade for inside Hospital Interest on ditto January 31 John July Labor land Leon Greenman Line and grade Loans Louis Marcus measurement of edgestone measurement of sidewalk º e º º e s º º º º ſº º tº Park Plan and profile Plan of street Plan showing estates Precinct Public Alley Repairs School-house Sewer sidewalk paving ſº º ſº tº South Boston square feet Stationery Taxes tº e tº gº tº º tº ſº tº tº tomb Total Votes Cast Ward Washington street West Roxbury William