| American Society of Municipal Engineers - 1914 - 36 pages
...the Engineer. PAYMENT. 42. Measurement and Payment — The quantity of bituminous macadam pavement to be paid for under this item shall be the number of square yards, measured horizontally, satisfactorily completed in accordance with the specifications.... | |
| New York (State). Department of Efficiency and Economy - 1915 - 434 pages
...described in Appendix V. Measurement and Payment SEC. 8. The quantity of bitumen in the refined tar, to be paid for under this item, shall be the number of tons, determined in accordance with Section 6 contained in the refined tar placed in the pavement in... | |
| New York (State). Legislature. Senate - 1915 - 1146 pages
...methods dd&cribed in Appendix V. Measurement and Payment SEC. 8. The quantity of bitumen in the tar, to be paid for under this item, shall be the number of tons, determined in accordance with section 6 contained in the tar placed on the road in accordance... | |
| Wilson Gardner Harger, Edmund Arnold Bonney - 1916 - 644 pages
...the fill; all stones shall be so placed as to make a fill of maximum stability. 14.3. The quantity to be paid for under this item shall be the number of cubic yards measured in its final position and incorporated in the work as directed by the Engineer.... | |
| Miami Conservancy District (Ohio) - 1916 - 616 pages
...done on damp or dirty surfaces. 82.3 Payment. — The quantity of cast iron, wrought iron and steel to be paid for under this item shall be the number of pounds actually placed in the work in accordance with the Drawings and requirements. The price stipulated... | |
| American Society for Municipal Improvements - 1916 - 668 pages
...the engineer. Measurement and Payment. The quantity of bitumen in the asphalt cement or refined tar, to be paid for under this item, shall be the number of tons, determined in accordance with the paragraph headed "Samples," contained in the asphalt cement... | |
| 1917 - 882 pages
...of the paving filled with tightly-driven spalls. 57.3 Payment. — The quantity of Dry Rubble Paving to be paid for under this item shall be the number of cubic yards actually placed within the limits prescribed. The crushed rock or gravel used in this connection... | |
| 1918 - 394 pages
...Cut-back Asphalt Cement, as specified. MEASUREMENT AND PAYMENT. The quantity of bituminous material to be paid for under this' item shall be the number of gallons placed on the highway in accordance with the specifications and requirements, or used as directed... | |
| |