Search Images Maps Play YouTube News Gmail Drive More »
Sign in
Books Books
" Overhaul (1,000 feet (300 meters) free haul)', as the case may be, which price and payment shall constitute full compensation for all labor, equipment, tools and incidentals necessary to complete the article. "
Specifications for Construction of Roads and Bridges in National Forests and ... - Page 58
by United States. Bureau of Public Roads, United States. Public Roads Administration - 1941 - 512 pages
Full view - About this book

Cases Decided in the Court of Claims of the United States, Volume 111

United States. Court of Claims - 1948 - 886 pages
...be measured in its original position. 1-12. Basis of Payment. — The yardage of excavation measured as provided above shall be paid for at the contract unit price per cubic yard under the items "Excavation, space grading", or "Excavation, for footings" in the bid form, as the...
Full view - About this book

Cases Decided in the United States Court of Claims ... with ..., Volume 137

United States. Court of Claims, Audrey Bernhardt - 1957 - 1028 pages
...distance measured along the center line of the cemetery. Basis of Payment ART. 104. The station-yards, determined as provided above, shall be paid for at the contract unit price per station-yard for "Overhaul (500 feet (150 meters) free haul)", or "Overhaul (1,000 feet (300...
Full view - About this book

Cases Decided in the United States Court of Claims ... with ..., Volumes 120-130

United States. Court of Claims, Audrey Bernhardt - 1955 - 1002 pages
...(1,000 feet free haul)," as the case may be, which price and payment shall constitute full compensation for all labor, equipment, tools, and incidentals necessary to complete the item. Under the general requirements in the same specifications appeared the following provisions : Art....
Full view - About this book

Handbook for Highway Engineers: Containing Information Ordinarily ..., Volume 1

Wilson Gardner Harger, Edmund Arnold Bonney - 1927 - 1820 pages
...expressly provided, shall be full compensation for furnishing, hauling, and placing all materials, and for all labor, equipment, tools, and incidentals necessary to complete the item. Concrete Bridges Description. — Concrete bridges to be built as indicated on plans, conforming to...
Full view - About this book

Standard Road and Bridge Specifications

Wisconsin. State Highway Commission - 1931 - 300 pages
...shall be to the nearest one-tenth (1/10) cubic yard. 30.5 Basis of Payment. (a) The yardage measured as provided above shall be paid for at the Contract unit price per cubic yard bid for "Pea Gravel Surface Course," which price shall be full compensation for all materials, spreading,...
Full view - About this book

Standard Specifications for Road and Bridge Construction

Wisconsin. State Highway Commission - 1941 - 912 pages
...incidentals necessary to complete and maintain the work. The yardage of required "Binder Soil," measured as provided above, shall be paid for at the contract unit price per cubic yard for said item, which price shall be full compensation for furnishing, loosening, drying, pulverizing, processing,...
Full view - About this book

Principles of Highway Construction as Applied to Airports, Flight Strips ...

United States. Bureau of Public Roads, United States. Public Roads Administration - 1943 - 600 pages
...BASIS OF PAYMENT 52-5.1 The yardage or tonnage of base course material, determined as provided in 4.1 above, shall be paid for at the contract unit price per cubic yard or per ton for "Gravel Base Course," of the class and grading called for in the bid schedule, which...
Full view - About this book

Principles of Highway Construction as Applied to Airports, Flight Strips ...

United States. Bureau of Public Roads, United States. Public Roads Administration - 1943 - 536 pages
...the completed base course. The tonnage shall be actual weight. BASIS OF PAYMENT 60-5.1 The tonnage, determined as provided above, shall be paid for at the contract unit price per ton for "Hot Asphalt Concrete Base Course, Stone Aggregate," or "Hot Asphalt Concrete Base...
Full view - About this book

Standard Specifications for Construction of Airports

United States. Civil Aeronautics Administration - 1948 - 604 pages
...payment shall be full compensation for furnishing and placing all materials; for mortar; for masonry; and for all labor, equipment, tools, and incidentals necessary to complete the item, except foundation excavation, or concrete footings. Payment will be made under: Item D-753-5.1 Unclassified...
Full view - About this book

Specifications for Construction of Roads and Bridges in National Forests and ...

1948 - 604 pages
...the number of square yards of brick sidewalk complete in place and accepted. BASIS OF PAYMENT 331-5.1 The yardage, determined as provided above, shall be paid for at the contract unit price per square yard for "Brick Sidewalk," which price and payment shall constitute full compensation...
Full view - About this book




  1. My library
  2. Help
  3. Advanced Book Search
  4. Download EPUB
  5. Download PDF