| United States. Court of Claims - 1948 - 886 pages
...be measured in its original position. 1-12. Basis of Payment. — The yardage of excavation measured as provided above shall be paid for at the contract unit price per cubic yard under the items "Excavation, space grading", or "Excavation, for footings" in the bid form, as the... | |
| United States. Court of Claims, Audrey Bernhardt - 1957 - 1028 pages
...distance measured along the center line of the cemetery. Basis of Payment ART. 104. The station-yards, determined as provided above, shall be paid for at the contract unit price per station-yard for "Overhaul (500 feet (150 meters) free haul)", or "Overhaul (1,000 feet (300... | |
| United States. Court of Claims, Audrey Bernhardt - 1955 - 1002 pages
...(1,000 feet free haul)," as the case may be, which price and payment shall constitute full compensation for all labor, equipment, tools, and incidentals necessary to complete the item. Under the general requirements in the same specifications appeared the following provisions : Art.... | |
| Wilson Gardner Harger, Edmund Arnold Bonney - 1927 - 1820 pages
...expressly provided, shall be full compensation for furnishing, hauling, and placing all materials, and for all labor, equipment, tools, and incidentals necessary to complete the item. Concrete Bridges Description. — Concrete bridges to be built as indicated on plans, conforming to... | |
| Wisconsin. State Highway Commission - 1931 - 300 pages
...shall be to the nearest one-tenth (1/10) cubic yard. 30.5 Basis of Payment. (a) The yardage measured as provided above shall be paid for at the Contract unit price per cubic yard bid for "Pea Gravel Surface Course," which price shall be full compensation for all materials, spreading,... | |
| Wisconsin. State Highway Commission - 1941 - 912 pages
...incidentals necessary to complete and maintain the work. The yardage of required "Binder Soil," measured as provided above, shall be paid for at the contract unit price per cubic yard for said item, which price shall be full compensation for furnishing, loosening, drying, pulverizing, processing,... | |
| United States. Civil Aeronautics Administration - 1948 - 604 pages
...payment shall be full compensation for furnishing and placing all materials; for mortar; for masonry; and for all labor, equipment, tools, and incidentals necessary to complete the item, except foundation excavation, or concrete footings. Payment will be made under: Item D-753-5.1 Unclassified... | |
| 1948 - 604 pages
...the number of square yards of brick sidewalk complete in place and accepted. BASIS OF PAYMENT 331-5.1 The yardage, determined as provided above, shall be paid for at the contract unit price per square yard for "Brick Sidewalk," which price and payment shall constitute full compensation... | |
| |