| 1967 - 858 pages
...for the safety and convenience of the Government inspectors in the performance of their duties. 2. The contractor shall provide and maintain an inspection system acceptable to the Government covering the supplies hereunder. 4. Quality Program Calibration Requirements As previously indicated,... | |
| 2002 - 726 pages
...prescribed in 217.7104(a), use the following clause: INSPECTION AND MANNER OF DOING WORK (JAN 1997) (a) The Contractor shall perform work in accordance...90 days after the completion of all work required. id) The Contractor shall not permit any welder to work on a vessel unless the welder is, at the time... | |
| 1997 - 772 pages
...require the Contractor to correct or replace It at the Contractor's expense. (2) If the Contractor falls to proceed promptly with the replacement or correction...work required. (d) The Contractor shall not permit ai welder to work on a vessel unless the welder Is, at the time of the work, qualified to the standards... | |
| 1998 - 716 pages
...workmanship and charge the Contractor the excess costs incurred. (3) As specified in the contract, the Contractor shall provide and maintain an inspection...available to the Government during performance of the contract and for 90 days after the completion of all work required. 48 CFR Ch. 12 (10-1-98 Edition)... | |
| 1997 - 712 pages
...workmanship and charge the Contractor the excess costs incurred. (3) As specified in the contract, the Contractor shall provide and maintain an inspection...available to the Government during performance of the contract and for 90 days after the completion of all work required. (d) The Contractor shall not permit... | |
| 2005 - 722 pages
...workmanship and charge the Contractor the excess costs incurred. (3) As specified in the contract, the Contractor shall provide and maintain an inspection...complete records of all inspection work and shall 48 CFR Ch. 12 (10-1-05 Edition) make them available to the Government during performance of the contract... | |
| 1986 - 1052 pages
...material or workmanship and charge to the Contractor the excess cost occasioned the Government thereby. As specified in the job order, the Contractor shall...an inspection system acceptable to the Government covering the work specified in the job order. Records of all inspection work by the Contractor shall... | |
| 1998 - 766 pages
...charge the Contractor the excess coea incurred. (3) As specified in the job order, the Совtractor shall provide and maintain an inspection system acceptable...the Government. (4) The Contractor shall maintain cwt píete records of all inspection work and siuii make them available to the Governmea'. during performance... | |
| 1977 - 1240 pages
...conclusive except as regards latent defects, fraud, or such gross mistakes as amount to fraud. (e) The Contractor shall provide and maintain an Inspection system acceptable to the Government covering the work hereunder. Records of all Inspection work by the Contractor shall be kept complete... | |
| United States. Congress. House. Select Committee on Small Business - 1956 - 1168 pages
...therefor." 9. Paragraph 5 of Article XX is amended, to read as follows: "THE CONTRACTOR'S INSPECTION SYSTEM "The Contractor shall provide and maintain an inspection system acceptable to the Government covering the aluminum sold hereunder. Records of all inspection work by the Contractor shall be kept... | |
| |