| United States. Court of Claims - 1948 - 886 pages
...differing from those shown on the drawings or indicated in the specifications, or unknown conditions of an unusual nature differing materially from those...ordinarily encountered and generally recognized as being inherent in work of the character provided for in the plans and specifications, the Contracting... | |
| United States. Court of Claims, Audrey Bernhardt - 1963 - 938 pages
...differing from those shown on the drawings or indicated in the specifications, or unknown conditions of an unusual nature differing materially from those...ordinarily encountered and generally recognized as being inherent in work of the character provided for in the plans and specificationSj the Contracting... | |
| Philippines - 1988 - 596 pages
...of the project which were not included as items of work in the original contract. b. Where there are subsurface or latent physical conditions at the site differing materially from those indicated in the contract beyond the limit of the Change Order. c. Where there are unknown physical conditinos at... | |
| United States. Army. Corps of Engineers - 1934 - 396 pages
...differing from *;:ose shown on the drawings or indicated in the specifications, or unknown conditions of an unusual nature differing, materially from those...ordinarily encountered and generally recognized as being inherent in work of the character provided for in the plans and specifications, the Deputy Contracting... | |
| 1939 - 1306 pages
...differing from those shown on the drawings or Indicated In the specifications, or unknown conditions of an unusual nature differing materially from those...and generally recognized as Inhering In work of the chara:ter provided for In the plans and specifications, the attention of the contracting officer shall... | |
| United States. Court of Claims - 1948 - 818 pages
...obvious to both parties that plaintiff had encountered changed and unforeseen subsurface conditions of an unusual nature differing materially from those...encountered and generally recognized as inhering in embankment construction work of the character covered by the contract and which conditions had not... | |
| 1981 - 524 pages
...shall be allowed if asserted after final payment under this contract. 4. DIFFERING SITE CONDITIONS (a) The Contractor shall promptly, and before such conditions...indicated in this contract, or (2) unknown physical condition* at the site, of an tin* usual nature, differing materially from those ordinarily encountered... | |
| 1976 - 864 pages
...4-18.5104 Differing site condition*. (a) Contract provisions. Clause 4 of Standard Form 23A provides that the contractor shall promptly, and before such conditions...site differing materially from those indicated in the contract, or (2) unknown physical conditions at the site of an unusual nature, differing materially... | |
| 1978 - 1058 pages
...payment under this contract. § 1-7.602-4 Differing site conditions. DIFFERING SITE CONDITIONS (a) The Contractor shall promptly, and before such conditions...conditions at the site differing materially from those indiTitle 41 — Public Contracts, Property Management rated in this contract, or (2) unknown physical... | |
| 1969 - 256 pages
...construction contracts. (a) Contract provisions. Cause 4 of Standard Form 23A provides that the sontractor shall promptly, and before such conditions are disturbed,...site differing materially from those Indicated in the contract, or (2) unknown physical conditions at the site of an unusual nature, differing materially... | |
| |