| 1982 - 536 pages
...sit* dilfen.ig materially from those indicated in this contract, or (2) unknown physical condition* at the site, of an unusual nature, differing materially from those ordinarily encountered and generally recognised as inhering in work of the character provided for in this contract. The Contracting Officer... | |
| 1986 - 798 pages
...contractor shall promptly, and before such conditions are disturbed, notify the recipient in writing of: (1) Subsurface or latent physical conditions at the site...differing materially from those indicated in this subagreement, or (2) Unknown physical conditions at the site, of an unusual nature, differing materially... | |
| 1968 - 1348 pages
...such conditions are dlslurlted. notify the Contracting Officer in writing of: (a) subsurface or Intent physical conditions at the site differing materially from those indicated In this contract, or (b) unknown physical conditions at the site, of nn unusual nature, din. -nut: materially from those... | |
| 1993 - 586 pages
...the site differing materially from those indicated in the contract or if unknown physical conditions of an unusual nature, differing materially from those...ordinarily encountered and generally recognized as inherent in the work provided for In the contract, are encountered at the site, the party discovering... | |
| United States. Navy Dept. Office of the General Counsel - 1949 - 320 pages
...Вт. v. United Slates, 107 Ct. CI. 555 (1946). dicated in the specifications, or unknown conditions of an unusual nature differing materially from those...ordinarily encountered and generally recognized as being inherent in work of the character provided for in the drawings and specifications, the contracting... | |
| 1997 - 556 pages
...the site differing materilly from those indicated in the con•act or if unknown physical conditions of an unusual nature, differing materially from those...ordinarily encountered and generally recognized as inherent in the work provided for in the contract, are encountered at the site, the party discovering... | |
| 1976 - 864 pages
...promptly, and before such conditions are disturbed, notify the Contracting Officer in writing of (1) subsurface or latent physical conditions at the site differing materially from those indicated in the contract, or (2) unknown physical conditions at the site of an unusual nature, differing materially... | |
| 1970 - 260 pages
...promptly, and before such conditions are disturbed, notify the Contracting Officer in writing of (1) subsurface or latent physical conditions at the site differing materially from those indicated in the contract, or (2) unknown physical conditions at the site of an unusual nature, differing materially... | |
| 1995 - 1072 pages
...the site differing materially from those indicated in the contract or if unknown physical conditions of an unusual nature, differing materially from those...ordinarily encountered and generally recognized as Inherent in the work provided for in the contract, are encountered at the site, the party discovering... | |
| 2005 - 540 pages
...contractor shall promptly, and before such conditions are disturbed, notify the claimant in writing of: (1) Subsurface or latent physical conditions at the site differing materially from those listed in this contract, or (ii) Unknown physical conditions at the site, of an unusual nature, differing... | |
| |