| 1999 - 644 pages
...in this contract, or (2) unknown physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered and generally...inhering in work of the character provided for in the contract. (b) The Contracting Officer shall investigate the site conditions promptly after receiving... | |
| 1964 - 1202 pages
...physical conditions at the tite differ* inf materially from those indicated in this contract, or (b) unknown physical conditions at the site, of an unusual...differing materially from those ordinarily encountered and Cencnliy recognized as inhering in work of the character provided for in this contract. The Contracting... | |
| 1969 - 628 pages
...provided in this contract, no charge for any extra work or material will be allowed. 4. CHANGED CONDITIONS The Contractor shall promptly, and before such conditions...disturbed, notify the Contracting Officer in writing of: (a) subsurface or latent physical conditions at the site differing materially from those indicated... | |
| 1964 - 432 pages
...promptly, and before such conditions are disturbed, notify the Contracting Officer in writing of: (a) subsurface or latent physical conditions at the site...materially from those indicated in this contract, or (b) unknown physical conditions at the site, of an unusual nature, differing materially from those... | |
| 2003 - 634 pages
...Contracting Officer of (1) subsurface or latent physical conditions at the site which differ materially fro» those indicated in this contract, or (2) unknown physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inhering in work... | |
| 1982 - 536 pages
...contract. 4. DIFFERING SITE CONDITIONS (;ii The Contractor shall promptly, and before such conditions arc disturbed, notify the Contracting Officer in writing...(1) Subsurface or latent physical conditions at the sit* dilfen.ig materially from those indicated in this contract, or (2) unknown physical condition*... | |
| 1997 - 602 pages
...following: (1) The contractor shall promptly, and before such conditions are disturbed, notify the claimant in writing of: (1) Subsurface or latent physical conditions at the site differing materially from those listed in this contract, or (ii) Unknown physical conditions at the site, of an unusual nature, differing... | |
| 1999 - 604 pages
...following: (1) The contractor shall promptly, and before such conditions are disturbed, notify the claimant in writing of: (1) Subsurface or latent physical conditions at the site differing materially from those listed in this contract, or (ii) Unknown physical conditions at the site, of an unusual nature, differing... | |
| 2003 - 542 pages
...following: (1) The contractor shall promptly, and before such conditions are disturbed, notify the claimant in writing of: (1) Subsurface or latent physical conditions at the site differing materially from those listed in this contract, or (ii) Unknown physical conditions at the site, of an unusual nature, differing... | |
| 1955 - 908 pages
...Conditions") authorizing additional compensation if the contractor "encountered unknown conditions of an unusual nature differing materially from those...inhering in work of the character provided for in the plans and specifications." The contractor's claim was denied by the contracting officer and the... | |
| |