...shall be allowed if asserted after final payment under this contract. 4. DIFFERING SITE CONDITIONS (a) The Contractor shall promptly, and before such conditions...encountered and generally recognized as inhering in wort of the character provided for in this contract. The Contracting Officer shall promptly investigate... | |
| 1981 - 842 pages
...conditions. (a) Contract provisions. Clause 4 of Standard Form 23A provides that the contractor snail promptly, and before such conditions are disturbed,...site differing materially from those indicated in the contract, or (2) unknown physical conditions at the site of an unusual nature, differing materially... | |
| 1983 - 806 pages
...4-18.5104 Differing site conditions. (a) Contract provisions. Clause 4 of Standard Form 23A provides that the contractor shall promptly, and before such conditions...site differing materially from those indicated in the contract, or (2) unknown physical conditions at the site of an unusual nature, differing materially... | |
| 2005 - 628 pages
...to the Contracting Officer of (1) subsurface or latent physical conditions at the site which differ materially from those indicated in this contract,...physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inhering in work... | |
| 1983 - 574 pages
...shall be allowed if asserted after final payment under this contract 4. DIFFERING SITE CONDITIONS (a) The Contractor shall promptly, and before such conditions...disturbed, notify the Contracting Officer in writing of: (i) Subsurface or latent physical conditions at the site dilfcri.ig materially from those indicated... | |
| 1984 - 596 pages
...contract. 4. DIFFERING SITE CONDITIONS (a) The Contractor shall promptly, and before such conditions lire disturbed, notify the Contracting Officer in writing...(1) Subsurface: or latent physical conditions at the sit* dilferi.ig materially from those indicated in this contract, or (2) unknown physical condition*... | |
| 1988 - 872 pages
...subagreements. (a) The contractor shall promptly, and before such conditions are disturbed, notify the recipient in writing of: (1) Subsurface or latent physical conditions...differing materially from those Indicated in this subagreement, or (2) Unknown physical conditions at the site, of an unusual nature, differing materially... | |
| Robert A. Rubin, Sammie D. Guy, Alfred C. Maevis, Virginia Fairweather - 1992 - 332 pages
...to the Contracting Officer of (1) subsurface or latent physical conditions at the site which differ materially from those indicated in this contract,...unknown physical conditions at the site, of an unusual mature, which differ materially from those ordinarily encountered and generally recognized as inhering... | |
| Sidney M. Levy - 1996 - 428 pages
...definition of Force Majeure in Article XV below; (v) "Differing Site Conditions/' which term shall refer to unknown physical conditions at the site of an unusual...ordinarily encountered and generally recognized as inherent in work of the nature provided for herein, including but not limited to, conditions requiring... | |
| |